
Guides
Part of Who is actually pushing small home design forward, from tiny houses to middle housing
Vetting a small home design firm: credentials, fees, and who keeps the drawings
Due diligence before you sign with a design firm: credentials, comparable permitted work, fee structure, deliverables and who owns the drawings.
What to take away
- Ask for permitted, completed projects in your jurisdiction, not a portfolio of photos.
- Get a numbered deliverables list before anyone quotes a fee.
- Verify every license number in the issuing board's public roster.
- Settle drawing ownership and reuse rights in the contract.
- Put insurance and hazard questions into the design phase.
Ask for permitted work and a written deliverables list before you talk price. The order below is the order to check them in.
Credentials to verify and how to check them
Ask for the license number, the issuing board, and the insurance certificate before you discuss design.
Architects are licensed by state boards in every US state. Search the state roster, or the national registration directory, for the name and number on the contract.
Structural drawings need a licensed professional engineer in the state where the work is built. Ask who will seal them.
Only a handful of states regulate interior designers by title or practice. NCIDQ certification is a credential, not a license.
Firm type changes which credentials apply. Our comparison of design firm options sets out how architects, design-build firms, and prefab suppliers differ.
Verify in this order:
Credentials to verify
- Ask for the license number and the board that issued it.
- Look the number up in that board's public roster.
- Confirm the status is active and read any disciplinary record.
- Have the insurance broker send certificates directly to you.
- Match the legal entity on the contract to the name on the permit application.
Verify Before You Sign
- License checked with state board
- Liability insurance confirmed by insurer
- Business registration matches proposal name
- Named individual doing the work
Comparable permitted work beats a portfolio
Portfolios show taste. Permits show competence.
Most large US cities publish permit records online. The NYC Buildings portal shows how a searchable filing system is organized, from application to final sign-off.
Ask for three projects with permit numbers, street addresses, and completion dates. Open each record yourself.
A comparable compact project shares four things with yours. Same jurisdiction, so the same code cycle applies. Same building type and construction. Similar floor area, within about a quarter of yours. A similar constraint, such as a load-bearing wall, a party wall, or a sleeping room with one window.
Check that each permit was issued, inspected, and closed. An open permit means the last job never finished its paperwork.
Vet Comparable Projects
- Two similar permitted projects in jurisdiction
- Permit numbers or addresses to verify
- References called, ask what went wrong
- Your project matches in constraint, not style
Deliverables first, then the fee structure
The deliverables list comes first. It decides whether any fee is fair. Unwritten scope sits at the top of our review of remodeling regrets.
Deliverables first
- Which drawings are produced, at what stage, and to what detail.
- Whether permit drawings are included or only design drawings.
- How many revision rounds are included.
- Who coordinates structural, mechanical, electrical and plumbing input.
- Who attends the building department and answers plan review comments.
- What happens if the design does not price within your budget.
The 203(k) sample documents page lists the paperwork a properly run project produces, from draw requests to change orders.
Fee structure
Best when
- Fixed fee
- Scope and deliverables are defined
- Hourly
- Existing conditions are unknown
- Percentage of construction
- Full service through construction
Watch for
- Fixed fee
- Exclusions buried in an attachment
- Hourly
- No cap on total hours
- Percentage of construction
- A rising estimate raises the fee
Typical ranges, to check against local quotes: hourly design time near $100 to $250, and a drawing set between $3,000 and $15,000 for a compact renovation. Percentage fees often land near 8 to 15 percent of construction cost.
Change orders start with scope added after the fee is agreed, revisions past the included rounds, or code problems found after design freeze. Ask for hourly rates by staff level and a not-to-exceed cap.
The homeowner's side of the list has its own discipline. Our small room layout checklist walks a room from measuring to a safety check, before the first drawing is issued.
Who holds the drawings and what the license allows
Copyright stays with the designer under US law. What you buy is a license to use the drawings.
Fix six terms in writing: the address, the printed set count, contractor bidding rights, reuse on a second property, native files, and what happens if the firm closes.
A seal belongs to one license holder and one project. Another designer cannot re-seal those drawings for a different address without taking responsibility for them.
Originals usually stay with the firm, so ask for a full digital set at each milestone.
Insurance and hazard questions for the design phase
Ask during design, when changes are still cheap.
Insurance and hazard questions
- Does anything in this design affect our insurability?
- Are there mitigation measures worth including now rather than later?
- What does our insurer require for this building type?
The Code Council reported on new guidance from the Insurance Institute for Business and Home Safety about lowering wildfire risk and insurance premiums. It describes a designation a homeowner can earn by meeting criteria and passing an annual inspection.
Examples include clearing flammable shrubs within five feet of the home and adding fine mesh over attic vents to resist ember entry. Those are design decisions, and they cost far less before construction.
Which hazard matters most depends on where you live. Our piece on regional design mistakes sets out which failure mode tends to reach a compact home first in each region.







